Weisshorn Single Thermal Sleeping Bag - Pink, 213cm

$45.98 $82.99 -44% OFF
You save: $37.01
Price reduced — was $82.99
✓ We'll notify you when this is back in stock!
Out of Stock
Qty:
14-Day Change-of-Mind Returns
Secure Checkout
Australian Stock
FREE Shipping No charge to your delivery address — Australia wide
Dispatches within 1-2 business days Australia-wide delivery, typically 2-10 business days
Australian Stock Ships from AU warehouses
We accept:American Express Apple Pay Google Pay Mastercard PayPal Shop Pay Union Pay Visa

Description & Specs

Weisshorn Single Thermal Sleeping Bag - Pink, 213cm

Stay comfortable on camping and hiking trips with the Weisshorn single thermal sleeping bag. The pink 213cm design features 500gsm hollow fibre filling, a soft pongee lining and a carry bag for portability.

Features

  • Single sleeping bag for camping and hiking
  • 500g/m² hollow fibre filling
  • Soft polyester pongee lining
  • Lightweight and water-resistant
  • Adjustable tightening strap
  • Secure closure velcro
  • Double opening zippers
  • Carry bag included

Specifications

  • Brand: Weisshorn
  • Colour: Pink
  • Material: 190T polyester ripstop
  • Filling: 500gsm hollow fibre
  • Lining: 190T polyester pongee
  • Temperature range: -5 degrees to -20 degrees
  • Comfort rating: 10 degrees
  • External dimensions: 213cm L x 75cm W
  • Packed dimensions: 27cm D x 45cm H
  • Weight: 2kg

Package Contents

  • 1 x Single Sleeping Bag
  • 1 x Carry Bag

Shipping & Returns

Standard Shipping Australia-wide
Dispatches within 1-2 business days from our Australian warehouses
14-Day Change-of-Mind Returns
Change of mind? Eligible products can be returned within 14 days of delivery if unopened, unused and in original packaging. Return postage and restocking fees may apply. This does not affect your Australian Consumer Law rights for faulty products.